Industrial Design/Build Project: BHC Cable Assemblies

“During the construction phase the dedicated staff of Porteous-Hardcastle Ltd. were on site to ensure that all trades were doing a quality job in a timely manner. The building was completed in early June 2004 allowing BHC
to occupy the property as needed”

Elaine and Bill Huisman – BHC Cable Assemblies Inc.

Comments are closed.